Properly Install Geared Motor
Correct installation, use and maintenance of the geared motor, an important part is to ensure the normal operation of mechanical equipment. Installed planetary geared motor, must be strictly in accordance with the following requirements and steps installed correctly:
The first step: Be sure to install the motor and geared motor are intact, and to check whether the size of each part of the motor and geared motor connected matching.
Step 2: unscrew the geared motor flange outer dust-hole on the lid, adjust the PCS system clamping ring so that the side of the hole and the dust-hole alignment, insert hex wrench. Thereafter, removal of the key of the motor output shaft. Prior to the installation of the motor input shaft positioning boss and deceleration into the the machine connected parts of the anti-rust oil wipe clean with gasoline or zinc sodium water.
The third step: the motor and deceleration into machine natural connection, the connection must guarantee consistent the geared motor input holes with the DC motor input shaft concentricity, and both the outside flange parallel, to do so can not only extend the life of the geared motor and can be obtained than ideal transmission efficiency and low noise. In addition, non-time installation hit with hammers and other heavy objects, to prevent damage to the bearings or gear axial force or excessive radial force. Connected to motor and geared motor flange mounting bolts tightened after tensioning bolt clamping ring tighten the PCS system.
The fourth step: geared motor installed turned by hand should be flexible, without catching phenomenon. Boot before tightening the various joins screw, load test should not be less than two hours, the operation should be smooth, shock, vibration, noise and oil leakage, and found that the problem should be immediately removed. Should be used regularly check each fastener is loose, to ensure proper operation.
The first step: Be sure to install the motor and geared motor are intact, and to check whether the size of each part of the motor and geared motor connected matching.
Step 2: unscrew the geared motor flange outer dust-hole on the lid, adjust the PCS system clamping ring so that the side of the hole and the dust-hole alignment, insert hex wrench. Thereafter, removal of the key of the motor output shaft. Prior to the installation of the motor input shaft positioning boss and deceleration into the the machine connected parts of the anti-rust oil wipe clean with gasoline or zinc sodium water.
The third step: the motor and deceleration into machine natural connection, the connection must guarantee consistent the geared motor input holes with the DC motor input shaft concentricity, and both the outside flange parallel, to do so can not only extend the life of the geared motor and can be obtained than ideal transmission efficiency and low noise. In addition, non-time installation hit with hammers and other heavy objects, to prevent damage to the bearings or gear axial force or excessive radial force. Connected to motor and geared motor flange mounting bolts tightened after tensioning bolt clamping ring tighten the PCS system.
The fourth step: geared motor installed turned by hand should be flexible, without catching phenomenon. Boot before tightening the various joins screw, load test should not be less than two hours, the operation should be smooth, shock, vibration, noise and oil leakage, and found that the problem should be immediately removed. Should be used regularly check each fastener is loose, to ensure proper operation.